PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct hangers at the 2nd Floor Facing North-East (800x600).jpg Finished installing the piping for the water tie in at Rahway Ave. (800x600).jpg Installed metal decking at Derrick -5 (Roof) Facing East (800x600).jpg Started repairing the inside Stairwell -2 (800x600).jpg Welding tube steels at the Skylight Facing South (800x600).jpg
Previous pageNext page Started repairing the inside Stairwell -2 (800x600)
Started repairing the inside Stairwell -2 (800x600)